|
|
|
|
SolarEdge Synergy > 100kW 277/480 VAC SetApp 3-Phase Grid-Tie Synergy Manager - Fixed Voltage
SolarEdge 3-phase inverters combine with SolarEdge power optimizers to provide superior performance at a competitive price.
Note: One SE100K-US08IBNZ4 Synergy Manager also requires:
three Synergy Units (SE-SUK-USR0INNN4), purchased separately.
Specifications
Model
|
SE100KUS
(SE100K-US08IBNZ4)
|
Series
|
Synergy - Three Phase Inverter with Synergy Technology
|
Manufacturer
|
SolarEdge
|
Mechanical
Type
|
Grid-Tie
|
Operating Temperature Range
|
-40 to +140°F / -40° C to +60° C
|
Enclosure
|
NEMA 3R
|
Cooling
|
Fans (user replaceable)
|
Dimensions (H x W x D)
|
Synergy Manager: 14.17" x 22.4" x 11.6"
Synergy Unit: 22" x 12.9" x 10.75"
|
Weight
|
Synergy Manager: 39.6 lbs
Synergy Unit: 70.4 lbs.
|
Shipping Method
|
Freight
|
Input (DC)
Maximum DC Power (Module STC) Inverter / Synergy Unit (STC)
|
150,000 / 50,000 W
|
Transformer-less, Ungrounded
|
Yes
|
Maximum Input Voltage DC+ to DC-
|
1000 V
|
Operating Voltage Range
|
850 - 1000 V
|
Maximum Input Current
|
3 x 40
|
Reverse-Polarity Protection
|
Yes
|
Output (AC)
Rated AC Power Output
|
100,000 VA
|
Maximum AC Power Output
|
100,000 VA
|
AC Output Line Connections
|
3W + PE, 4W + PE
|
AC Output Voltage Minimum-Nominal-Maximum(1) (L-N)
|
244 - 277 - 305 VAC
|
AC Output Voltage Minimum-Nominal-Maximum(1) (L-L)
|
422.5 - 480 - 529 VAC
|
AC Frequency Min-Nom-Max
|
59.3 - 60 - 60.5 Hz
|
Maximum Continuous Output Current (per Phase) @208V
|
120 A
|
GFDI Threshold
|
1
|
Utility Monitoring, Islanding Protection, Configurable Power Factor,
Country Configurable Thresholds
|
Yes
|
Additional Features
Supported Communication Interfaces
|
x RS485, Ethernet, Wi-Fi (optional), Cellular (optional)
|
Inverter Commissioning
|
With the SetApp mobile application using built-in Wi-Fi access point for local connection
|
Photovoltaic Rapid Shutdown System
|
NEC 2014, 2017 and 2020, Built-in
|
Standard Compliance
Safety
|
UL1699B, CSA C22.2#107.1, Canadian AFCI according to T.I.L. M-07
|
Grid Connection Standards
|
IEEE 1547, Rule 21, Rule 14 (HI)
|
Detailed Description
Simplify Commercial & Industrial Installs and Commissioning with the new SolerEdge Synergy Power Series
The Synergy Power Series is perfect for many ground mount, carport and
rooftop solutions. Go bigger with 150% DC oversizing, keep costs low with modular design and provide confidence with robust safety features.
Get Insight. Onsite.
Introducing Pre-commissioning from SolarEdge.
- Validate each stage of the install process from your smartphone using SetApp
- Resolve system issues before actual grid connection via SetApp and a USB power bank
- Automatically identify any wiring, communication, isolation, or DC polarity issues
Simplified Installs and Servicing
- Reduce time, cost and labor with a simple 2-person installation through lightweight, modular design
- Easy access and serviceability through the Synergy Manager. No need to open inverter covers for configuration or maintenance
- Full system visibility and accurate troubleshooting with built-in, module-level monitoring
- Supports 3-wire connection and accommodates no-neutral or delta configurations
Features
- Pre-commissioning feature for automated validation of system components and wiring during the site installation process and prior to grid connection
- Easy 2-person installation with lightweight, modular design (each inverter consists of 2 or 3 Synergy units and one Synergy Manager)
- Independent operation of each Synergy unit enables higher uptime and easy serviceability
- Built-in thermal sensors detect faulty wiring ensuring enhanced protection and safety
- Built-in arc fault protection and rapid shutdown
- Built-in PID mitigation for maximized system performance
- Monitored* and field-replaceable surge protection devices, to better withstand surges caused by lightning or other events
- Built-in module-level monitoring with Ethernet or cellular communication for full system visibility
|
|
|
|
|
|
|
|
|